Site map
- Consultations
- Login
- Register
- Accessibility
- Privacy
- Cookies
- Instructions
- Current documents open to consultation
-
- Draft Freight Strategy Consultation
- Representation search for Draft Freight Strategy Consultation
-
- 1.0 Introduction
- 2.0 Aim and objectives of the strategy
- 3.0 Background
- 4.0 National, regional, and local policies
- 5.0 The freight and logistics industry in Central Bedfordshire
- 6.0 Managing road freight movement
- 7.0 Rest facilities
- 8.0 Servicing and deliveries
- 9.0 The impact of growth on freight movements
- 10.0 Non-road freight
- 11.0 Sustainability
- 12.0 Conclusion
- Appendix 1: The road and rail network in Central Bedfordshire
- Appendix 2: HGV peak hour two-way flow in Central Bedfordshire
- Appendix 3: Key freight generators
- Appendix 4: The designated freight route network in Central Bedfordshire
- Appendix 5: 7.5 tonne weight limit restrictions in Central Bedfordshire
- Closed published consultations - Click on down arrow on the right - select document - click on the green icon on the left to view representations
-
- Validation Guide Supporting Documents
- Representation search for Validation Guide Supporting Documents
-
- Application Checklists
- Full Planning Permission Checklists
- Householder Development Checklists
- Lawful Development Certificates Checklists
- Listed Building and Conservation Area Consent Checklists
- Outline Planning Permission Checklists
- Post Decision Applications Forms and Checklists
-
- Representations made against Approval of details reserved by condition checklist & form
- Representations made against Non-Material Amendment Validation Checklist
- Representations made against Modification or Discharge of Section 106 Agreement Validation Checklist
- Representations made against Variation/ Removal of Condition Application Validation Checklist
- Prior Approval/ Notification Application Checklists
- Tree Works and Hedgerows Application Checklists
- Miscellaneous Applications Checklists
- Supporting documents and templates
- Validation Guide: A guide to submitting Planning Applications (National and Local Requirements)
- Representation search for Validation Guide: A guide to submitting Planning Applications (National and Local Requirements)
-
- 1.0 Validation
- 2.0 Electronic Submissions
- 3.0 Personal and Sensitive Data
- 4.0 Payment
- 5.0 Document Descriptions and Requirements
- 6.0 Drawings and Plans – National List Requirements
- 7.0 Supporting Documents - National List Requirements
- 8.0 Supporting documents – Local list requirements
- 9.0 Validation disputes
- 10.0 Local List Principles and Criteria for list preparation and review
- 11.0 Local list consultation
- 12.0 Local List Adoption and Review
- Central Bedfordshire Design Guide SPD
- Representation search for Central Bedfordshire Design Guide SPD
-
- Supporting Documents
- Central Bedfordshire Design Guide SPD
-
- Representations made against Design Guide SPD - Contents and Introduction - Chapters 1 to 4.
- Representations made against Design Guide SPD - Context and Identity - Chapter 5
- Representations made against Design Guide SPD - Built Form - Chapter 6
- Representations made against Design Guide SPD - Movement - Chapter 7
- Representations made against Design Guide SPD - Nature - Chapter 8
- Representations made against Design Guide SPD - Public Spaces - Chapter 9
- Representations made against Design Guide SPD - Uses - Chapter 10
- Representations made against Design Guide SPD - Homes and Buildings - Chapter 11
- Representations made against Design Guide SPD - Resources - Chapter 12
- Representations made against Design Guide SPD - Case Studies - Chapter 13
- Housing Policy Technical Guidance SPD
- Representation search for Housing Policy Technical Guidance SPD
- Parking Standards for New Developments Draft (Nov 2022)
- Representation search for Parking Standards for New Developments Draft (Nov 2022)
- Historic documents
-
- Validation Guide Supporting Documents
- Representation search for Validation Guide Supporting Documents
-
- Application Checklists
- Full Planning Permission Checklists
- Householder Development Checklists
- Lawful Development Certificates Checklists
- Listed Building and Conservation Area Consent Checklists
- Outline Planning Permission Checklists
- Post Decision Applications Forms and Checklists
-
- Representations made against Approval of details reserved by condition checklist & form
- Representations made against Non-Material Amendment Validation Checklist
- Representations made against Modification or Discharge of Section 106 Agreement Validation Checklist
- Representations made against Variation/ Removal of Condition Application Validation Checklist
- Prior Approval/ Notification Application Checklists
- Tree Works and Hedgerows Application Checklists
- Miscellaneous Applications Checklists
- Supporting documents and templates
- Validation Guide: A guide to submitting Planning Applications (National and Local Requirements)
- Representation search for Validation Guide: A guide to submitting Planning Applications (National and Local Requirements)
-
- 1.0 Validation
- 2.0 Electronic Submissions
- 3.0 Personal and Sensitive Data
- 4.0 Payment
- 5.0 Document Descriptions and Requirements
- 6.0 Drawings and Plans – National List Requirements
- 7.0 Supporting Documents - National List Requirements
- 8.0 Supporting documents – Local list requirements
- 9.0 Validation disputes
- 10.0 Local List Principles and Criteria for list preparation and review
- 11.0 Local list consultation
- 12.0 Local List Adoption and Review
- Draft On-Street Parking Management Strategy
- Representation search for Draft On-Street Parking Management Strategy
- Electric Vehicle Charging in New Development Supplementary Planning Document - Draft June 2022
- Representation search for Electric Vehicle Charging in New Development Supplementary Planning Document - Draft June 2022
- Forest of Marston Vale Supplementary Planning Document - Draft (June 2022)
- Representation search for Forest of Marston Vale Supplementary Planning Document - Draft (June 2022)
- Statement of Community Involvement - Consultation Draft (April 2022)
- Representation search for Statement of Community Involvement - Consultation Draft (April 2022)
- Proposed Main Modifications Schedule
- Representation search for Proposed Main Modifications Schedule
-
- SCHEDULE OF PROPOSED MAIN MODIFICATIONS
- Chapter 1: Introduction
- Chapter 4: Vision and Objectives
- Chapter 5:The Spatial Strategy
- Chapter 6: The Proposed Locations for Growth
-
- Representations made against MM9
- Representations made against MM10
- Representations made against MM11
- Representations made against MM12
- Representations made against MM13
- Representations made against MM14
- Representations made against MM15
- Representations made against MM16
- Representations made against MM17
- Representations made against MM19
- Representations made against MM20
- Representations made against MM21
- Chapter 7 (up to HA1): Implementation
-
- Representations made against MM22
- Representations made against MM23
- Representations made against MM24
- Representations made against MM25
- Representations made against MM26
- Representations made against MM27
- Representations made against MM28
- Representations made against MM29
- Representations made against MM30
- Representations made against MM31
- Representations made against MM32
- Representations made against MM33
- Representations made against MM34
- Representations made against MM35
- Representations made against MM36
- Representations made against MM37
- Representations made against MM38
- Representations made against MM39
- Representations made against MM40
- Representations made against MM41
- Representations made against MM42
- Chapter 7 (Policy HA1)
-
- Representations made against MM43
- Representations made against MM47
- Representations made against MM48
- Representations made against MM49
- Representations made against MM51
- Representations made against MM52
- Representations made against MM53
- Representations made against MM57
- Representations made against MM59
- Representations made against MM60
- Representations made against MM61
- Representations made against MM62
- Representations made against MM65
- Representations made against MM66
- Representations made against MM67
- Representations made against MM68
- Representations made against MM69
- Representations made against MM70
- Representations made against MM71
- Representations made against MM74
- Representations made against MM75
- Representations made against MM76
- Representations made against MM78
- Representations made against MM80
- Representations made against MM81
- Representations made against MM84
- Representations made against MM85
- Representations made against MM87
- Representations made against MM89
- Representations made against MM94
- Representations made against MM98
- Chapter 7 (From 7.9 onwards):
- Chapter 8: Green Belt, Coalescence and Settlements
- Chapter 9: Settlement Envelopes and Settlement Hierarchies
- Chapter 10: Planning for Gypsies and Travellers
- Chapter 11: Housing
- Chapter 12: Employment and Economy
- Chapter 13: Retail and Town Centres
- Chapter 14: Transport
- Chapter 15: Environmental Enhancement
-
- Representations made against MM153
- Representations made against MM154
- Representations made against MM158
- Representations made against MM159
- Representations made against MM162
- Representations made against MM163
- Representations made against MM166
- Representations made against MM169
- Representations made against MM170
- Representations made against MM171
- Representations made against MM172
- Representations made against MM173
- Representations made against MM174
- Chapter 16: Climate Change and Sustainability
- Chapter 17: High Quality Places
-
- Representations made against MM187
- Representations made against MM188
- Representations made against MM190
- Representations made against MM192
- Representations made against MM193
- Representations made against MM194
- Representations made against MM195
- Representations made against MM199
- Representations made against MM200
- Representations made against MM203
- Representations made against MM204
- Chapter 18: Historic Environment
- Chapter 19: Development in the Countryside
- Plan Appendices:
- Appendix 2: List of Superseded Policies
- Appendix 4:
- Appendix 5:
- Appendix 6:
- Appendix 7:
- Appendix 8:
- Proposed Modifications to Policy Maps
- Representation search for Proposed Modifications to Policy Maps
-
- 1. Modifications to Chapter 7 - Strategic Allocations
- 2. EMP1 Designations
- 3. Important Countryside Gaps
- 4. Small and Medium Allocations
- 4. Modification to Appendix 7 – Future Growth Locations
- 5. Modifications to Policy Maps – EMP5 Designations
- 6. Modifications to Policy Maps – Town Centre Boundaries
- 7. Modifications to Policy Maps – Open Space Designations
- 8. Other changes to previously proposed Settlement Envelopes
- 9. Changes to settlement envelopes arising from proposed allocations
-
- Representations made against PM54
- Representations made against PM55
- Representations made against PM57
- Representations made against PM57
- Representations made against PM59
- Representations made against PM60
- Representations made against PM62
- Representations made against PM64
- Representations made against PM64
- Representations made against PM67
- Representations made against PM72
- 10. Changes to previously proposed Green Belt boundaries
- Sustainability Appraisal Main Modifications Report
- Representation search for Sustainability Appraisal Main Modifications Report
-
- Chapter 1 - Introduction
- Chapter 2 - Methodology
- Chapter 3 - Sustainability Context
- Chapter 4 - SA Findings for the Spatial Strategy Options
- Chapter 5 - SA Findings for the Strategic Site Options
- Chapter 6 - SA Finding for Small-Medium Site Options
- Chapter 7 - SA Findings for the Local Plan as Proposed to be Modified
- Chapter 8 - Cumulative Effects
- Chapter 9 - Reasons for Choosing the Plan and Monitoring
- Chapter 10 - Conclusions, Consultation and Next Steps
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- Sustainability Appraisal Main Modifications Report: Non Technical Summary
- Representation search for Sustainability Appraisal Main Modifications Report: Non Technical Summary
- Habitats Regulations Assessment Addendum
- Representation search for Habitats Regulations Assessment Addendum
- Indoor Leisure Facilities - Draft Strategy & Action Plan
- Representation search for Indoor Leisure Facilities - Draft Strategy & Action Plan
- Sustainability Appraisal - Supplementary Report [EXAM 115/115B]
- Representation search for Sustainability Appraisal - Supplementary Report [EXAM 115/115B]
-
- Chapter 1: Introduction
- Chapter 2: Scope of Work
- Chapter 3: Approach to the SA
- Chapter 4: Supplementary SA Findings: Stage 1
- Chapter 5: Supplementary SA Findings: Stage 2
- Chapter 6: Summary of Changes to the SA Findings
- Chapter 7: Monitoring
- Chapter 8: Conclusions & Next Steps
- Appendix A: Updated Baseline Information
- Appendix B: Updated Policy Review
- Appendix C: Audit Trail Tables for Strategic Options
- Appendix D: Revised SA Matrix for the Approaches to Distributing Development Growth
- Appendix E: SA Matrix for the Alternative Employment Strategy Options
- Appendix F: SA Matrices for the Reasonable Alternative Residential Site Options
- Appendix G: SA Matrices for the Reasonable Alternative Employment Site Options
- Sustainability Appraisal - Supplementary Report: Non-Technical Summary [EXAM 115A]
- Representation search for Sustainability Appraisal - Supplementary Report: Non-Technical Summary [EXAM 115A]
- Transport Technical Paper [EXAM 114]
- Representation search for Transport Technical Paper [EXAM 114]
- Highways England & AECOM M1 Junction 13 Study: Local Model Validation Report [EXAM 114A]
- Representation search for Highways England & AECOM M1 Junction 13 Study: Local Model Validation Report [EXAM 114A]
- Highways England & AECOM M1 Junction 13 Study: Traffic Forecast Report [EXAM 114B]
- Representation search for Highways England & AECOM M1 Junction 13 Study: Traffic Forecast Report [EXAM 114B]
- Highways England & AECOM M1 Junction 13 Study: Mitigation Options Testing Results Report (Draft) [EXAM 114C]
- Representation search for Highways England & AECOM M1 Junction 13 Study: Mitigation Options Testing Results Report (Draft) [EXAM 114C]
- Housing Technical Paper [EXAM 113]
- Representation search for Housing Technical Paper [EXAM 113]
-
- 1. Introduction
- 2. Key Evidence Studies
- 3. Response to EXAM 69
-
- Representations made against 3.1 Key Points Raised in Relation to Housing Allocations
- Representations made against 3.3 SA1: North of Luton
- Representations made against 3.4 SA2: Marston Vale New Villages
- Representations made against 3.5 SA3: East of Arlesey
- Representations made against 3.6 SA4: East of Biggleswade
- Representations made against 3.7 Important Countryside Gaps
- Representations made against 3.8 HAS03 Aspley Guise (Land off Meadow View)
- Representations made against 3.9 HAS04 Barton-Le-Clay (Land at Luton Road)
- Representations made against 3.10 HAS09 Chalton (Land at Chapel Farm)
- Representations made against 3.11 HAS20 Harlington (Land West of Midland Mainline Railway)
- Representations made against 3.12 HAS24 Hockliffe (Land South West of the A5)
- Representations made against 3.13 HAS25 & HAS26 Hockliffe (Land at Leighton Road & A5 Watling Street)
- 4. Housing Supply
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- Employment Technical Paper [EXAM 112]
- Representation search for Employment Technical Paper [EXAM 112]
- Statement of Common Ground between Highways England & Central Bedfordshire Council [EXAM 111]
- Representation search for Statement of Common Ground between Highways England & Central Bedfordshire Council [EXAM 111]
- North Luton LVIA Addendum [EXAM 110-110E]
- Representation search for North Luton LVIA Addendum [EXAM 110-110E]
- Employment Land Update [EXAM 109]
- Representation search for Employment Land Update [EXAM 109]
- Holme Farm, Biggleswade - Planning Design Delivery Analysis Report [EXAM 108-108D]
- Representation search for Holme Farm, Biggleswade - Planning Design Delivery Analysis Report [EXAM 108-108D]
- Sundon Rail Freight Interchange - Alternative Site Assessment [EXAM 107/107A]
- Representation search for Sundon Rail Freight Interchange - Alternative Site Assessment [EXAM 107/107A]
- Prologis Park, Marston Gate - Expansion Scheme Comparison Document [EXAM 106]
- Representation search for Prologis Park, Marston Gate - Expansion Scheme Comparison Document [EXAM 106]
- Central Bedfordshire Pre-submission Local Plan (January 2018)
- Representation search for Central Bedfordshire Pre-submission Local Plan (January 2018)
-
- Foreword
- 1. Introduction
-
- Representations made against 1.1 What is the Central Bedfordshire Local Plan?
- Representations made against 1.2 National and Sub-Regional Context
- Representations made against 1.3 Developing the Spatial Strategy
- Representations made against 1.4 Calculating Housing Need and the Plan Target
- Representations made against 1.5 Partial Plan Review
- Representations made against 1.6 Plan Process
- Representations made against 1.7 Requirements of Plan-Making
- Representations made against 1.8 Which documents will this Local Plan replace?
- Representations made against 1.9 Where to view Local Plan documents
- Representations made against 1.10 About this consultation
- 2. Key Themes: A Snapshot of Central Bedfordshire - Challenges and Opportunities
-
- Representations made against 2.1 Overview
- Representations made against 2.2 Connectivity and Achieving Sustainable Growth and Communities
- Representations made against 2.3 Cross-boundary and neighbouring growth pressures and the role of the Green Belt
- Representations made against 2.4 Market Towns and Villages - local economy and services
- Representations made against 2.5 New community scale growth
- Representations made against 2.6 Environment, Heritage Assets and Sustainability
- 3. Consultation: Engagement
- 4. Vision & Objectives
- 5. The Spatial Strategy
- 6. The Proposed Locations for Growth
-
- Representations made against 6.1 Overview
- Representations made against 6.2 South Area
- Representations made against 6.3 A1 Corridor Area
- Representations made against 6.4 East-West Area
- Representations made against 6.5 Central Area
- Representations made against 6.6 Growth Strategy
- Representations made against Policy SP1: Growth Strategy
- Representations made against 6.7 Small & Medium Sites
- Representations made against 6.8 Neighbourhood Planning
- Representations made against 6.9 Housing Target
- Representations made against 6.10 Summary of Housing Growth in Central Bedfordshire 2015-2035
- Representations made against Policy SP2: National Planning Policy Framework - Presumption in Favour of Sustainable Development
- 7. Implementation
-
- Representations made against 7.1 Delivery Rates
- Representations made against 7.2 Housing Supply
- Representations made against 7.3 Monitoring
- Representations made against 7.4 The Key Diagram
- Representations made against 7.5 Strategic Allocations: General Requirements
- Representations made against Policy SP3: Generic Requirements for Strategic Sites
- Representations made against 7.6 What are Integrated Health and Care Hubs?
- Representations made against 7.7 Site Specific Allocation Policies
- Representations made against Policy SA1: North of Luton
- Representations made against Policy SE1: M1 Junction 11a - Sundon Rail Freight Interchange (RFI)
- Representations made against Policy SA2: Marston Vale New Villages
- Representations made against Policy SE2: M1 Junction 13 - Marston Gate Expansion
- Representations made against Policy SA3: East of Arlesey
- Representations made against Policy SA4: East of Biggleswade
- Representations made against Policy SE3: A1 Corridor - Holme Farm, Biggleswade
- Representations made against Policy SE4: Former RAF Base, Henlow
- Representations made against Policy HA1: Small and Medium Allocations
- Representations made against 7.9 Identified Locations for Future Growth
- Representations made against Policy SA5: Houghton Regis North Strategic Allocation
- 8. Green Belt, Coalescence and Settlements
-
- Representations made against 8.1 Introduction to Green Belt
- Representations made against 8.2 Green Belt and Sustainable Development - Exceptional Circumstances for small scale release of Green Belt Land
- Representations made against 8.3 Green Belt release
- Representations made against 8.4 Improvements to Green Belt land
- Representations made against 8.5 Development in the Green Belt
- Representations made against 8.6 Development within Green Belt Settlements
- Representations made against 8.7 Affordable housing in the Green Belt
- Representations made against Policy SP4: Development in the Green Belt
- Representations made against 8.8 Coalescence
- Representations made against 8.9 Important Countryside Gaps
- Representations made against Policy SP5: Preventing Coalescence and Important Countryside Gaps
- 9. Settlement Envelopes and Settlement Hierarchy
- 10. Planning for Gypsies & Travellers
- 11. Housing
-
- Representations made against 11.1 Housing Mix
- Representations made against Policy H1: Housing Mix
- Representations made against Policy H2: Housing Standards
- Representations made against 11.3 Supporting an Ageing Population
- Representations made against Policy H3: Housing for Older People
- Representations made against 11.4 Affordable Housing
- Representations made against Policy H4: Affordable Housing
- Representations made against 11.5 Rural Exception Sites
- Representations made against Policy H5: Rural Exception Sites
- Representations made against Policy H6: Starter Homes
- Representations made against 11.7 Self and Custom Build Housing
- Representations made against Policy H7: Self and Custom Build Housing
- Representations made against 11.8 Planning for Gypsy & Traveller sites
- Representations made against Policy H8: Assessing planning applications for Gypsy & Traveller Sites
- Representations made against Policy H9: Assessing planning applications for Travelling Showpeople sites
- 12. Employment & Economy
-
- Representations made against 12.1 Overview
- Representations made against 12.2 Portfolio of Employment Land
- Representations made against 12.3 B-Uses and Non B-Uses
- Representations made against 12.4 Supply of Sites
- Representations made against 12.5 Strategic Warehousing and Logistics
- Representations made against 12.6 Employment Sites and Uses
- Representations made against Policy EMP1: Employment Sites and Uses
- Representations made against Policy EMP2: Change of Use to Non-Employment Generating Uses
- Representations made against 12.7 Employment proposals within and adjacent to Settlement Envelopes
- Representations made against Policy EMP3: Employment proposals within or adjacent to Settlement Envelopes
- Representations made against 12.9 Rural and Visitor Economy
- Representations made against Policy EMP4: Rural and Visitor Economy
- Representations made against 12.10 Significant Facilities in the Countryside and Green Belt
- Representations made against Policy EMP5: Significant Facilities in the Countryside and Green Belt
- 13. Retail & Town Centres
-
- Representations made against 13.1 Retail Hierarchy
- Representations made against Policy R1: Ensuring Town Centre Vitality
- Representations made against Policy R2: Retail for minor service centres, villages and the rural economy
- Representations made against 13.4 Town Centre Development
- Representations made against Policy R3: Town Centre Development
- 14. Transport
-
- Representations made against 14.1 Overview of Transport Network
- Representations made against 14.3 Overview of Transport Issues
- Representations made against 14.4 Sustainable Approach to Mitigate Impacts on the Network
- Representations made against 14.6 Sustainable Transport Provision
- Representations made against 14.7 Transport Assessments and Travel Plans
- Representations made against Policy T1: Mitigation of Transport Impacts on the Network
- Representations made against 14.8 Highway Safety and Design
- Representations made against Policy T2: Highway Safety & Design
- Representations made against Policy T3: Parking
- Representations made against 14.10 Development and Public Transport Interchanges
- Representations made against Policy T4: Public Transport Interchanges
- Representations made against 14.11 Ultra Low Emissions Vehicles (ULEV)
- Representations made against Policy T5: Ultra Low Emission Vehicles
- Representations made against Policy T6: Management of Freight
- 15. Environmental Enhancement
-
- Representations made against 15.2 Green Infrastructure
- Representations made against Policy EE1: Green Infrastructure
- Representations made against 15.3 Enhancing biodiversity
- Representations made against Policy EE2: Enhancing Biodiversity
- Representations made against 15.4 Nature conservation - Designated Sites and Protected Species
- Representations made against Policy EE3: Nature conservation
- Representations made against 15.5 Woodlands, trees and hedgerows
- Representations made against Policy EE4: Trees, woodlands and hedgerows
- Representations made against 15.6 Landscape Character and Value
- Representations made against Policy EE5: Landscape Character and Value
- Representations made against 15.7 Tranquility
- Representations made against Policy EE6: Tranquility
- Representations made against 15.8 Chilterns AONB
- Representations made against Policy EE7: The Chilterns Area of Outstanding Natural Beauty
- Representations made against 15.9 Greensand Ridge NIA
- Representations made against Policy EE8: Greensand Ridge Nature Improvement Area
- Representations made against 15.10 The Forest of Marston Vale
- Representations made against Policy EE9: Forest of Marston Vale
- Representations made against 15.11 The Bedford & Milton Keynes Waterway Park
- Representations made against Policy EE10: The Bedford & Milton Keynes Waterway Park
- Representations made against 15.12 River and Waterway Network
- Representations made against Policy EE11: The River and Waterway Network
- Representations made against 15.13 Public Rights of Way
- Representations made against Policy EE12: Public Rights of Way
- Representations made against 15.14 Outdoor Recreation
- Representations made against Policy EE13: Outdoor sport, leisure and open space
- Representations made against 15.15 Local Green Space
- Representations made against 15.16 Restoration of Minerals & Waste sites
- Representations made against Policy EE14: Applications for Minerals & Waste Development
- 16. Climate Change & Sustainability
-
- Representations made against 16.1 Overview
- Representations made against Policy CC1: Climate Change & Sustainability
- Representations made against 16.3 Large-scale Renewable and Sustainable Energy Development
- Representations made against Policy CC2: Sustainable energy development
- Representations made against 16.4 Flood Risk Management
- Representations made against Policy CC3: Flood Risk Management
- Representations made against 16.5 Development close to watercourses
- Representations made against Policy CC4: Development close to watercourses
- Representations made against Policy CC5: Sustainable Drainage
- Representations made against 16.7 Water Supply and Sewerage Infrastructure
- Representations made against Policy CC6: Water Supply and Sewerage Infrastructure
- Representations made against Policy CC7: Water Quality
- Representations made against 16.9 Safeguarding the Environment and Development from Pollution and Land Instability
- Representations made against Policy CC8: Pollution and Land Instability
- 17. High Quality Places
-
- Representations made against 17.1 Design and Local Character
- Representations made against Policy HQ1: High Quality Development
- Representations made against 17.2 Planning Obligations and the Community Infrastructure Levy
- Representations made against Policy HQ2: Planning Obligations and the Community Infrastructure Levy
- Representations made against 17.3 Social and Community Infrastructure
- Representations made against Policy HQ3: Provision for Social and Community Infrastructure
- Representations made against Policy HQ4: Indoor Sport and Leisure Facilities
- Representations made against 17.5 Communications Infrastructure
- Representations made against Policy HQ5: Broadband and Telecommunications Infrastructure
- Representations made against 17.6 Public Art
- Representations made against Policy HQ7: Public Art
- Representations made against Policy HQ8: Back-land Development
- Representations made against Policy HQ9: Larger Sites
- Representations made against Policy HQ10: Small open spaces
- Representations made against Policy HQ11: Modern Methods of Construction
- 18. Historic Environment
-
- Representations made against 18.1 Overview
- Representations made against 18.2 Archaeology
- Representations made against Policy HE1: Archaeology and Scheduled Monuments
- Representations made against 18.3 Historic Landscapes and Development
- Representations made against Policy HE2: Historic Parks and Gardens
- Representations made against 18.4 Built Heritage
- Representations made against 18.5 Listed Buildings
- Representations made against 18.6 Conservation Areas
- Representations made against Policy HE3: Built Heritage
- 19. Development in the Countryside
-
- Representations made against 19.1 Overview
- Representations made against 19.2 Re-use and replacement of buildings in the countryside
- Representations made against Policy DC1: Re-use of Buildings in the Countryside
- Representations made against Policy DC2: Replacement Dwellings in the Countryside
- Representations made against Policy DC3: Rural Workers Dwellings
- Representations made against 19.4 Equestrian Development
- Representations made against Policy DC4: Equestrian Development
- Representations made against 19.5 Protecting Agricultural Land
- Representations made against Policy DC5: Agricultural Land
- Central Bedfordshire Pre-submission Local Plan (January 2018) Appendices
- Representation search for Central Bedfordshire Pre-submission Local Plan (January 2018) Appendices
-
- Appendix 1: List of acronyms and technical terms
- Appendix 2: List of superseded policies
- Appendix 3: Monitoring Framework
- Appendix 4: Existing Employment sites & land that should be considered favourably for alternative (non-employment) uses
- Appendix 5: Important Countryside Gaps
- Appendix 6: Small & Medium Site Allocation Maps
- Appendix 7: Identified Locations for Future Growth
- Technical Reports
- Representation search for Technical Reports
-
- Level 1 Strategic Flood Risk Assessment
- Level 1 Strategic Flood Risk Assessment: Appendix Contents
- Level 1 Strategic Flood Risk Assessment: Appendix A
- Level 1 Strategic Flood Risk Assessment: Appendix B (1/2)
- Level 1 Strategic Flood Risk Assessment: Appendix B (2/2)
- Level 1 Strategic Flood Risk Assessment: Appendix C (1/2)
- Level 1 Strategic Flood Risk Assessment: Appendix C (2/2)
- Level 1 Strategic Flood Risk Assessment: Appendix D (1/2)
- Level 1 Strategic Flood Risk Assessment: Appendix D (2/2)
- Level 1 Strategic Flood Risk Assessment: Appendix E
- Level 1 Strategic Flood Risk Assessment: Appendix F (1/2)
- Level 1 Strategic Flood Risk Assessment: Appendix F (2/2)
- Level 1 Strategic Flood Risk Assessment: Appendix G
- Level 1 Strategic Flood Risk Assessment: Appendix H (1/2)
- Level 1 Strategic Flood Risk Assessment: Appendix H (2/2)
- Level 2 Strategic Flood Risk Assessment Vol. 1 (1/2)
- Level 2 Strategic Flood Risk Assessment Vol. 1 (2/2)
- Water Cycle Study
- Water Cycle Study: Appendix A-C
- Water Cycle Study: Maps 1-7
- Central Bedfordshire Retail Study
- Gypsy & Traveller Accommodation Assessment (GTAA)
- Functional Economic Market Assessment & Employment Land Review
- Central Bedfordshire & Luton Stage 1 & 2 Green Belt Study
- Central Bedfordshire & Luton Stage 1 & 2 Green Belt Study: Appendix 1
- Central Bedfordshire & Luton Stage 1 & 2 Green Belt Study: Appendix 2 & 3
- Central Bedfordshire Stage 3 Green Belt Study (1/2)
- Central Bedfordshire Stage 3 Green Belt Study (2/2)
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Ampthill
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Barton-le-Clay
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Billington
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Chalton
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Dunstable
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Eaton Bray
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Flitwick
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Harlington
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Heath & Reach
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Hockliffe
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Leighton Buzzard
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Leighton Linslade
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Luton (1/2)
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Luton (2/2)
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Ridgmont
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Slip End
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Steppingley
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Tebworth
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Tilsworth
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Tingrith
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Toddington (1/2)
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Toddington (2/2)
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Totternhoe
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Upper Sundon
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Westoning
- Central Bedfordshire Stage 3 Green Belt Study: Appendix - Woburn
- Urban Capacity Report
- Luton HMA Growth Options Study
- Luton HMA Growth Options Study: Appendix
- North Central Bedfordshire Growth Options Study
- North Central Bedfordshire Growth Options Study: Appendix 1-4
- North Central Bedfordshire Growth Options Study: Appendix 5 (1/2)
- North Central Bedfordshire Growth Options Study: Appendix 5 (2/2)
- Residential Development Viability Report
- Local Plan Viability Report (Update)
- Local Plan Viability Report (Update): Appendix 1-4
- Local Plan Viability Report (Update): Appendix 5-7
- Development Gain & Economic Benefit from East West Rail
- Infrastructure Delivery Plan
- Important Countryside Gaps Study
- Central Bedfordshire Local Plan Stage 1B Transport Modelling
- Central Bedfordshire Local Plan Stage 1C & 1D Transport Modelling
- Central Bedfordshire Local Plan Stage 1C & 1D Transport Modelling: Appendices (1/2)
- Central Bedfordshire Local Plan Stage 1C & 1D Transport Modelling: Appendices (2/2)
- Central Bedfordshire Local Plan Stage 2A Transport Modelling (1/2)
- Central Bedfordshire Local Plan Stage 2A Transport Modelling (2/2)
- Windfall Topic Paper
- Sustainability Appraisal
- Sustainability Appraisal: Non-Technical Summary
- Sustainability Appraisal: Appendix 1 - Statement of Compliance
- Sustainability Appraisal: Appendix 3 - Compatibility Analysis
- Sustainability Appraisal: Appendix 4 - Areas A-D
- Sustainability Appraisal: Appendix 5 - Growth Location Options
- Sustainability Appraisal: Appendix 6 - Strategic Policies
- Sustainability Appraisal: Appendix 7a - Strategic Allocations
- Sustainability Appraisal: Appendix 7b - Broad Locational Options
- Sustainability Appraisal: Appendix 7c - Non-Strategic Site Options
- Sustainability Appraisal: Appendix 7d - Small & Medium Site Options
- Sustainability Appraisal: Appendix 8 - Equalities Impact Assessment
- Sustainability Appraisal: Appendix 9 - Representations to Reg 18
- Sustainability Appraisal: Appendix 10 - Screening Changes
- Habitats Regulation Assessment (HRA)
- Central Bedfordshire & Luton Strategic Housing Market Assessment (SHMA) (Dec 2017)
- Strategic Housing Land Availability Assessment (SHLAA)
- Strategic Housing Land Availability Assessment (SHLAA): Appendix A-B
- Strategic Housing Land Availability Assessment (SHLAA): Appendix C-D (1/4)
- Strategic Housing Land Availability Assessment (SHLAA): Appendix C-D (2/4)
- Strategic Housing Land Availability Assessment (SHLAA): Appendix C-D (3/4)
- Strategic Housing Land Availability Assessment (SHLAA): Appendix C-D (4/4)
- Housing Implementation Strategy (HIS)
- Consultation Statement
- Settlement Envelope Review
- Settlement Envelope Review: Appendix - Ampthill-Clophill
- Settlement Envelope Review: Appendix - Cranfield-Flitwick
- Settlement Envelope Review: Appendix - Houghton Conquest-Moggerhanger
- Settlement Envelope Review: Appendix - Northill-Wrestlingworth
- Proposed Submission Policies Map
- Environmental Framework
- Site Assessment Forms (Housing)
- Representation search for Site Assessment Forms (Housing)
-
- Ampthill
- Arlesey
- Aspley Guise
- Barton-Le-Clay
- Biggleswade
- Billington
- Blunham
- Brogborough
- Caddington
- Campton & Chicksands
- Chalgrave
- Chalton
- Clifton
- Clophill
- Cranfield
- Dunstable
- Dunton
- Eaton Bray
- Eggington
- Eversholt
- Everton
- Eyeworth
- Fairfield
- Flitton & Greenfield
- Flitwick
- Gravenhurst
- Harlington
- Haynes
- Heath & Reach
- Henlow
- Hockliffe
- Houghton Conquest
- Houghton Regis
- Hulcote & Salford
- Hyde
- Kensworth
- Langford
- Leighton Linslade
- Lidlington
- Marston Moretaine
- Maulden
- Meppershall
- Millbrook
- Milton Bryan
- Moggerhanger
- Northill
- Old Warden
- Potton
- Pulloxhill
- Ridgmont
- Sandy
- Shefford
- Shillington
- Silsoe
- Slip End
- Southill
- Stanbridge
- Steppingley
- Stondon
- Stotfold
- Streatley
- Studham
- Sundon
- Sutton
- Tempsford
- Tilsworth
- Tingrith
- Toddington
- Totternhoe
- Westoning
- Woburn
- Wrestlingworth
- Site Assessment Results (Housing & Employment)
- Representation search for Site Assessment Results (Housing & Employment)
-
- Site Assessment Technical Document
- Site Assessment Technical Document: Appendix A - Glossary
- Site Assessment Technical Document: Appendix B - SHLAA Guidance
- Site Assessment Technical Document: Appendix C - Site Assessmet Criteria
- Site Assessment Technical Document: Appendix D - Preliminary Site Assessment Results
- Site Assessment Technical Document: Appendix E - Parish Summaries
- Strategic Employment Site Assessment Technical Document
- Strategic Employment Site Assessment Technical Document: Appendix A - Glossary
- Strategic Employment Site Assessment Technical Document: Appendix B - All Submitted Sites
- Strategic Employment Site Assessment Technical Document: Appendix C - Assessment Proforma
- Strategic Employment Site Assessment Technical Document: Appendix D - Assessment Summary
- Strategic Employment Site Assessment Technical Document: Appendix E - Identifying Options
- Strategic Employment Site Assessment Technical Document: Appendix F - All Proformas
- Submitted Sites: Parish Maps
- Representation search for Submitted Sites: Parish Maps
- Central Bedfordshire Draft Local Plan (July 2017)
- Representation search for Central Bedfordshire Draft Local Plan (July 2017)
-
- Quick Read Overview of the Draft Local Plan
- Foreword
- 1. Introduction
-
- Representations made against 1.1 What is the Central Bedfordshire Local Plan?
- Representations made against 1.2 National and Sub-Regional Context
- Representations made against 1.3 Developing the Spatial Strategy
- Representations made against 1.4 What is included at this stage of the Local Plan?
- Representations made against 1.5 Plan Process
- Representations made against 1.6 Requirements of Plan-Making
- Representations made against 1.7 Which documents does it replace?
- Representations made against 1.8 Where to view Local Plan documents
- Representations made against 1.9 How to make comments
- 2. Key Themes for the Local Plan
-
- Representations made against 2.1 Central Bedfordshire: Issues, Challenges & Opportunities
- Representations made against 2.2 Connectivity and Achieving Sustainable Growth and Communities
- Representations made against 2.3 Cross-boundary and neighbouring growth pressures and the role of the Green Belt
- Representations made against 2.4 Market towns, villages - local economy and services
- Representations made against 2.5 New community scale growth
- Representations made against 2.6 Environment, Heritage Assets and Sustainability
- 3. Consultation
- 4. Community Planning
- 5. Developing the Strategy
- 6. Vision & Objectives
- 7. The Spatial Strategy
-
- Representations made against 7.1 Overview
- Representations made against 7.2 Key Local & Strategic Drivers
- Representations made against 7.3 Urban Intensification, Previously Developed Land & Transport Hubs
- Representations made against 7.4 Strategic Opportunities
- Representations made against 7.5 Spatial Strategy Approach
- Representations made against 7.6 The Proposed Growth Locations
- Representations made against 7.7 Growth Strategy
- Representations made against Policy SP1: Growth Strategy
- Representations made against 7.8 Small & Medium Sites
- Representations made against 7.9 Neighbourhood Planning
- Representations made against 7.10 Housing Target
- Representations made against 7.11 Summary of Housing Growth in Central Bedfordshire 2015-20135
- Representations made against 7.12 Presumption in Favour of Sustainable Development
- Representations made against Policy SP2: National Planning Policy Framework - Presumption in Favour of Sustainable Development
- 8. Implementation
- 9. Green Belt, Coalescence and Settlements
-
- Representations made against 9.1 Introduction to Green Belt
- Representations made against 9.2 Green Belt and Sustainable Development - Exceptional Circumstances for small scale release of Green Belt Land
- Representations made against 9.3 Green Belt release
- Representations made against 9.4 Improvements to Green Belt land
- Representations made against 9.5 Development in the Green Belt
- Representations made against 9.6 Development within Green Belt Settlements
- Representations made against 9.7 Affordable housing in the Green Belt
- Representations made against Policy SP3: Development in the Green Belt
- Representations made against 9.8 Coalescence
- Representations made against Policy SP4: Coalescence
- Representations made against 9.9 Important Countryside Gaps & New Green Belt
- Representations made against Policy SP5: Important Countryside Gaps
- 10. Settlement Envelopes and Settlement Hierarchy
- 11. Planning for Gypsies & Travellers
- 12. Housing
-
- Representations made against 12.1 Housing Mix
- Representations made against Policy H1: Housing Mix
- Representations made against 12.2 Housing Standards Review
- Representations made against Policy H2: Housing Standards
- Representations made against 12.3 Supporting an Ageing Population
- Representations made against Policy H3: Supporting Older People
- Representations made against 12.4 Affordable Housing
- Representations made against Policy H4: Affordable Housing
- Representations made against 12.5 Rural Exception Sites
- Representations made against Policy H5: Rural Exception Sites
- Representations made against 12.6 Starter Homes
- Representations made against Policy H6: Starter Homes
- Representations made against 12.7 Self and Custom Build Housing
- Representations made against Policy H7: Self and Custom Build Housing
- Representations made against 12.8 Planning for Gypsy & Traveller sites
- Representations made against Policy H8: Assessing planning applications for Gypsy & Traveller Sites
- Representations made against 12.9 Planning for Travelling Showpeople Sites
- Representations made against Policy H9: Assessing planning applications for Travelling Showpeople sites
- 13. Employment & Economy
-
- Representations made against 13.2 Portfolio of Employment Land
- Representations made against 13.3 B-Uses and Non B-Uses
- Representations made against 13.4 Supply of Sites
- Representations made against 13.5 Strategic Warehousing and Logistics
- Representations made against Policy EMP1: Strategic Warehousing and Logistics
- Representations made against 13.6 Employment Sites and Uses
- Representations made against Policy EMP2: Employment Sites and Uses
- Representations made against Policy EMP3: Change of Use to Non-Employment Generating Uses
- Representations made against 13.7 Employment proposals outside of Settlement Envelopes
- Representations made against Policy EMP4: Employment proposals adjacent to Settlement Envelopes
- Representations made against 13.8 Education and Skills
- Representations made against 13.9 Rural and Visitor Economy
- Representations made against Policy EMP5: Rural and Visitor Economy
- Representations made against 13.10 Significant Facilities in the Countryside and Green Belt
- Representations made against Policy EMP6: Significant Facilities in the Countryside and Green Belt
- 14. Retail & Town Centres
-
- Representations made against 14.1 Retail Hierarchy
- Representations made against 14.2 The Sequential Approach and Town Centre Vitality
- Representations made against Policy R1: Ensuring Town Centre Vitality
- Representations made against 14.3 Neighbourhood and Rural Retail and Services
- Representations made against Policy R2: Retail for minor service centres, villages and the rural economy
- Representations made against 14.4 Town Centre Development
- Representations made against Policy R3: Town Centre Development
- 15. Transport
-
- Representations made against 15.1 Overview of Transport Network
- Representations made against 15.2 Local Transport Plan
- Representations made against 15.3 Overview of Transport Issues
- Representations made against 15.4 Sustainable Approach to Mitigate Impacts on the Network
- Representations made against 15.5 The Central Bedfordshire and Luton Strategic Transport Model
- Representations made against Policy T1: Identifying Connectivity, Accessibility and Impacts on the Transport Network
- Representations made against 15.6 Transport Assessments and Travel Plans
- Representations made against 15.7 Sustainable Transport Provision
- Representations made against Policy T2: Mitigation of Transport Impacts on the Network
- Representations made against 15.8 Highway Safety and Design
- Representations made against Policy T3: Highway Safety & Design
- Representations made against 15.9 Parking
- Representations made against Policy T4: Parking
- Representations made against 15.10 Development and Public Transport Interchanges
- Representations made against Policy T5: Development and Public Transport Interchanges
- Representations made against 15.11 Strategic Transport Improvement to Increase Capacity
- Representations made against Policy T6: Strategic Transport Improvements
- Representations made against 15.12 Ultra Low Emissions Vehicles (ULEV)
- Representations made against Policy T7: Ultra Low Emission Vehicles
- Representations made against Policy T8: Management of Freight
- 16. Environmental Enhancement
-
- Representations made against 16.2 Green Infrastructure
- Representations made against Policy EE1: Green Infrastructure
- Representations made against 16.3 Enhancing biodiversity
- Representations made against Policy EE2: Enhancing Biodiversity
- Representations made against 16.4 Nature conservation - Designated Sites and Protected Species
- Representations made against Policy EE3: Nature conservation
- Representations made against 16.5 Woodlands, trees and hedgerows
- Representations made against Policy EE4: Trees, woodlands and hedgerows
- Representations made against 16.6 Landscape Character and Value
- Representations made against Policy EE5: Landscape Character and Value
- Representations made against 16.7 Tranquility
- Representations made against Policy EE6: Tranquility
- Representations made against 16.8 Chilterns AONB
- Representations made against Policy EE7: The Chilterns Area of Outstanding Natural Beauty
- Representations made against 16.9 Greensand Ridge NIA
- Representations made against Policy EE8: Greensand Ridge Nature Improvement Area
- Representations made against 16.10 The Forest of Marston Vale
- Representations made against Policy EE9: Forest of Marston Vale
- Representations made against 16.11 The Bedford & Milton Keynes Waterway Park
- Representations made against Policy EE10: The Bedford & Milton Keynes Waterway Park
- Representations made against 16.12 Public Rights of Way
- Representations made against Policy EE11: Public Rights of Way
- Representations made against 16.13 Outdoor Recreation
- Representations made against Policy EE12: Outdoor sport, leisure and open space
- Representations made against 16.14 Local Green Space
- Representations made against 16.15 Applications for Minerals & Waste Development
- Representations made against Policy EE13: Applications for Minerals & Waste Development
- 17. Climate Change & Sustainability
-
- Representations made against 17.2 Planning for Climate Change
- Representations made against Policy CC1: Climate Change & Sustainability
- Representations made against 17.3 Large-scale Renewable Energy
- Representations made against Policy CC2: Renewable energy development
- Representations made against 17.4 Flood Risk Management
- Representations made against Policy CC3: Flood Risk Management
- Representations made against 17.5 Development close to watercourses
- Representations made against Policy CC4: Development close to watercourses
- Representations made against 17.6 Sustainable Drainage and Surface Water Management
- Representations made against Policy CC5: Sustainable Drainage
- Representations made against 17.7 Water Quality and the Water Framework Directive
- Representations made against Policy CC6: Water Quality
- Representations made against 17.8 Safeguarding the Environment and Development from Pollution
- Representations made against Policy CC7: Pollution
- 18. High Quality Places
-
- Representations made against 18.1 Health Impact Assessment
- Representations made against Policy HQ1: Health Impact Assessment
- Representations made against 18.2 Social and Community Infrastructure
- Representations made against Policy HQ2: Social and Community Infrastructure
- Representations made against 18.3 Indoor Sport and Leisure Facilities
- Representations made against Policy HQ3: Indoor Sport and Leisure Facilities
- Representations made against 18.4 Communications Infrastructure
- Representations made against Policy HQ5: Broadbrand and Telecommunications Infrastructure
- Representations made against 18.5 Design and Local Character
- Representations made against Policy HQ6: High Quality Development
- Representations made against 18.6 Public Art
- Representations made against Policy HQ7: Public Art
- Representations made against 18.7 Back-land Development
- Representations made against Policy HQ8: Back-land Development
- Representations made against 18.8 Larger Sites
- Representations made against Policy HQ9: Larger Sites
- Representations made against 18.9 Small open spaces
- Representations made against Policy HQ10: Small open spaces
- Representations made against 18.10 Modern Methods of Construction
- Representations made against Policy HQ11: Modern Methods of Construction
- 19. Historic Environment
-
- Representations made against 19.2 Archaeology
- Representations made against Policy HE1: Archaeology
- Representations made against 19.3 Historic Landscapes and Development
- Representations made against Policy HE2: Historic Parks and Gardens
- Representations made against 19.4 Built Heritage
- Representations made against 19.5 Listed Buildings
- Representations made against 19.6 Conservation Areas
- Representations made against Policy HE3: Built Heritage
- 20. Development in the Countryside
-
- Representations made against Policy DC1: Development in the Countryside
- Representations made against 20.2 Re-use and replacement of buildings in the countryside
- Representations made against Policy DC2: Re-use of Buildings in the Countryside
- Representations made against Policy DC3: Replacement Dwellings in the Countryside
- Representations made against 20.3 Rural Workers Dwellings
- Representations made against Policy DC4: Rural Workers Dwellings
- Representations made against 20.4 Equestrian Development
- Representations made against Policy DC5: Equestrian Development
- Representations made against 20.5 Protecting Agricultural Land
- Representations made against Policy DC6: Agricultural Land
- Technical Reports
- Representation search for Technical Reports
-
- Central Bedfordshire & Luton Green Belt Study
- Central Bedfordshire & Luton Green Belt Study: Appendix 1
- Central Bedfordshire & Luton Green Belt Study: Appendices 2 & 3
- Central Bedfordshire Retail Study
- Central Bedfordshire Local Plan Stage 1A Transport Modelling
- Sustainability Appraisal
- Sustainability Appraisal: Non-Technical Summary
- Sustainability Appraisal: Appendices
- Development Gain & Economic Benefit from East West Rail
- Functional Economic Market Assessment & Employment Land Review
- Initial Strategic Housing Market Assessment for Central Bedfordshire & Luton
- Luton HMA Growth Options Study
- Luton HMA Growth Options Study: Appendices
- North Central Bedfordshire Growth Options Study
- North Central Bedfordshire Growth Options Study: Appendix 1-4
- North Central Bedfordshire Growth Options Study: Appendix 5 - Location Assessment Forms 1
- North Central Bedfordshire Growth Options Study: Appendix 5 - Location Assessment Forms 2
- Settlement Capacity Initial Study
- Settlement Capacity Initial Study: Appendix A - Area A Assessments
- Settlement Capacity Initial Study: Appendix B - Area B Assessments
- Settlement Capacity Initial Study: Appendix C - Area C Assessments
- Settlement Capacity Initial Study: Appendix D - Area D Assessments
- Settlement Capacity Initial Study: Appendix 5 - Constraints and Assets Analysis
- Urban Capacity Report
- Residential Development Viability Report
- Water Cycle Study
- Water Cycle Study: Appendix A 1
- Water Cycle Study: Appendix A 2
- Water Cycle Study: Appendix B
- Water Cycle Study: Appendix C
- Water Cycle Study: Maps 1 & 2
- Water Cycle Study: Maps 3 & 4
- Water Cycle Study: Maps 5 & 6
- Water Cycle Study: Map 7
- Level 1 Strategic Flood Risk Assessment
- Level 1 Strategic Flood Risk Assessment: Appendices Contents Page
- Level 1 Strategic Flood Risk Assessment: Appendix A - Watercourse Maps 1
- Level 1 Strategic Flood Risk Assessment: Appendix A - Watercourse Maps 2
- Level 1 Strategic Flood Risk Assessment: Appendix A - Watercourse Maps 3
- Level 1 Strategic Flood Risk Assessment: Appendix A - Watercourse Maps 4
- Level 1 Strategic Flood Risk Assessment: Appendix B - Flood Zone Maps 1
- Level 1 Strategic Flood Risk Assessment: Appendix B - Flood Zone Maps 2
- Level 1 Strategic Flood Risk Assessment: Appendix B - Flood Zone Maps 3
- Level 1 Strategic Flood Risk Assessment: Appendix B - Flood Zone Maps 4
- Level 1 Strategic Flood Risk Assessment: Appendix C - Climate Change Maps 1
- Level 1 Strategic Flood Risk Assessment: Appendix C - Climate Change Maps 2
- Level 1 Strategic Flood Risk Assessment: Appendix C - Climate Change Maps 3
- Level 1 Strategic Flood Risk Assessment: Appendix C - Climate Change Maps 4
- Level 1 Strategic Flood Risk Assessment: Appendix D - Surface Water Flooding Maps 1
- Level 1 Strategic Flood Risk Assessment: Appendix D - Surface Water Flooding Maps 2
- Level 1 Strategic Flood Risk Assessment: Appendix D - Surface Water Flooding Maps 3
- Level 1 Strategic Flood Risk Assessment: Appendix D - Surface Water Flooding Maps 4
- Level 1 Strategic Flood Risk Assessment: Appendix D - Surface Water Flooding Maps 5
- Level 1 Strategic Flood Risk Assessment: Appendix E - Groundwater Flooding Maps 1
- Level 1 Strategic Flood Risk Assessment: Appendix E - Groundwater Flooding Maps 2
- Level 1 Strategic Flood Risk Assessment: Appendix E - Groundwater Flooding Maps 3
- Level 1 Strategic Flood Risk Assessment: Appendix F - Flood Warning Coverage Maps 1
- Level 1 Strategic Flood Risk Assessment: Appendix F - Flood Warning Coverage Maps 2
- Level 1 Strategic Flood Risk Assessment: Appendix F - Flood Warning Coverage Maps 3
- Level 1 Strategic Flood Risk Assessment: Appendix F - Flood Warning Coverage Maps 4
- Level 1 Strategic Flood Risk Assessment: Appendix G - Groundwater Source Protection Maps
- Level 1 Strategic Flood Risk Assessment: Appendix H - Flooding From Artificial Sources Maps 1
- Level 1 Strategic Flood Risk Assessment: Appendix H - Flooding From Artificial Sources Maps 2
- Level 1 Strategic Flood Risk Assessment: Appendix H - Flooding From Artificial Sources Maps 3