Object

Central Bedfordshire Design Guide SPD

Representation ID: 16196

Received: 16/03/2023

Respondent: Cllr Victoria Harvey

Representation Summary:

Connectivity to destinations needs to be made much stronger in 7.2.14

A04

Full text:

7.2.14
This is not strong enough. There have to be connected safe cycle and pedestrian routes from the new estates to town centres, services, schools stations and other villages etc. The through connectivity is crucial to whether a new estate just creates congestion in a town or whether people actually have the choice to cycle or walk safely. This needs to be made stronger so that section 106 for through routes can be obtained. The eastern Leighton Linslade development has no through routes or connectivity for cycling to the rest of the town. As a result the traffic in the town is getting worse and worse. There is a real lack of joined up thinking and lack of officers to deliver on through routes in CBC so this need for through routes needs to be addressed by developers